RFPQ #333 LLB Bishop's Peak Phase 2 Modernization Project
The District plans to construct a new 12,000 square foot classroom building with 12 classrooms including site work, demolition, earthwork, landscaping, sidewalks, covered walkways, retaining walls, utilities, DSA required lighting, on a District-owned site located at 451 Jaycee Drive in San Luis Obispo, San Luis Obispo County, California, and the District is soliciting proposals for the construction of the Work.
Project Drawings-Combined PDF
(click to expand/collapse)

Name | Size | ||
BISHOPS PEAK PHASE 2_DRAFT SET_20250418 | 1.1 MB |
Project Drawings - Separate PDFs
(click to expand/collapse)

Name | Size | ||
001 - AS-001 | 280.9 KB | ||
002 - AS-101 | 259.8 KB | ||
003 - A-101 | 306.3 KB | ||
004 - A-111 | 280.8 KB | ||
005 - A-121 | 215.5 KB | ||
006 - A-201 | 661.4 KB |